Validation reports by cycle for ERS RA altimeter, long-term monitoring of ERS altimeter 5RA) and radiometer (MWR). These reports are provided by CLS after analysis of CERSAT OPR data. This quality control of ERS altimeter data points out possible degradation, instrumental errors, correction recommandations, etc...
Cycle reports (OPR product)
484950515253545556575859606162636465666768697071727374757677787980818283
Long-term monitoring of ERS altimeter data (OPR product)
Report of Task 2 of IFREMER contract N 02/2.210.752 - January 2003
Report of Task 2 of IFREMER contract N 01/2.210 374 - January 2002
Report of Tasks 2&4 of IFREMER contract N 00/2.210 052 - January 2001
Validation and long-term monitoring of reprocessed (version 6) phase C ERS-1 OPR data, CLS/DOS/NT/02.539, March 2002
Miscellaneous
ERS2/MWR drift evaluation and correction , ERS2/MWR long-term survey NCLS.DOS/NT/03.688 - 20 February 2003
CERSAT-2 Off-nadir evolution user note, CLS/DOS/NT01.459, August 2001
CERSAT-2 Impact of the IF filters on Altimetry, CLS/DOS/NT/01.451, August 2001
CERSAT-2 off-nadir angle evolution - validation and recommandation note, CLS/DOS/NT/01.446 - July 2001
Note on ERS-2 Sigma0 variations since January 2000, CLS/DOS/NT/00.286, CLS study from August 2000
ERS-2 Radar Altimeter off pointing impact study / Task 4 - Analysis of the mispointing angle obtained during the AOCS test. FCLS/DOS/NT/00.244 - March 2000
ERS-2 Radar Altimeter off pointing impact study / Task 3 - Mispointing correction algorithm . Final report of IFREMER contract N 99/2 210833, CLS/DOS/NT/99.219 - January 2000
ERS-2 Radar Altimeter off pointing impact study / Task 2 - Analysis of the impact of the mispointing on the altimeters measurements using OPR data , Final report of IFREMER contract N 99/2 210833, CLS/DOS/NT/99.199 - October 1999
ERS-2 Radar Altimeter off pointing impact study / Task 1 - Impact of the mispointing on the altimeters measurements by simulation , Final report of IFREMER contract N 99/2 210833, CLS/DOS/NT/99.195 - October 1999
An inter-calibration study of Topex/Poseidon, ERS-1 and ERS-2 Altimetric Missions Final report of IFREMER contract N 97/2 426 086/C, CLS/DOS/NT/98.070 - April 1998
