Documents & tools>Reports>Cal/Val ERS Altimeter

Calibration and monitoring of ERS/RA altimeter

Validation reports by cycle for ERS RA altimeter, long-term monitoring of ERS altimeter 5RA) and radiometer (MWR). These reports are provided by CLS after analysis of CERSAT OPR data. This quality control of ERS altimeter data points out possible degradation, instrumental errors, correction recommandations, etc...

Cycle reports (OPR product)

484950515253545556575859606162636465666768697071727374757677787980818283

Long-term monitoring of ERS altimeter data (OPR product)

Report of Task 2 of IFREMER contract N 02/2.210.752 - January 2003

Report of Task 2 of IFREMER contract N 01/2.210 374 - January 2002

Report of Tasks 2&4 of IFREMER contract N 00/2.210 052 - January 2001

Validation and long-term monitoring of reprocessed (version 6) phase C ERS-1 OPR data, CLS/DOS/NT/02.539, March 2002

Miscellaneous

ERS2/MWR drift evaluation and correction , ERS2/MWR long-term survey NCLS.DOS/NT/03.688 - 20 February 2003

CERSAT-2 Off-nadir evolution user note, CLS/DOS/NT01.459, August 2001

CERSAT-2 Impact of the IF filters on Altimetry, CLS/DOS/NT/01.451, August 2001

CERSAT-2 off-nadir angle evolution - validation and recommandation note, CLS/DOS/NT/01.446 - July 2001

Note on ERS-2 Sigma0 variations since January 2000, CLS/DOS/NT/00.286, CLS study from August 2000

ERS-2 Radar Altimeter off pointing impact study / Task 4 - Analysis of the mispointing angle obtained during the AOCS test. FCLS/DOS/NT/00.244 - March 2000

ERS-2 Radar Altimeter off pointing impact study / Task 3 - Mispointing correction algorithm . Final report of IFREMER contract N 99/2 210833, CLS/DOS/NT/99.219 - January 2000

ERS-2 Radar Altimeter off pointing impact study / Task 2 - Analysis of the impact of the mispointing on the altimeters measurements using OPR data , Final report of IFREMER contract N 99/2 210833, CLS/DOS/NT/99.199 - October 1999

ERS-2 Radar Altimeter off pointing impact study / Task 1 - Impact of the mispointing on the altimeters measurements by simulation , Final report of IFREMER contract N 99/2 210833, CLS/DOS/NT/99.195 - October 1999

An inter-calibration study of Topex/Poseidon, ERS-1 and ERS-2 Altimetric Missions Final report of IFREMER contract N 97/2 426 086/C, CLS/DOS/NT/98.070 - April 1998